The scheme comprised 1.7 km of road upgrade comprising of the following: -
- 1.7 km of road upgrade to include Bus Priority measures and Bus Lanes, Cycle paths and footpath upgrade works
- New Surface Water sewer, watermain, telecom ducting
- New public Lighting and signalised junctions including the introduction of a new signalised intersection to replace an existing roundabout
- Road constructed while allowing a minimum of one way traffic at all times
Clifton Scannell Emerson Associates (CSEA) produced a Detailed Design and Contract Documents. CSEA provided construction supervision and acted as PSDP for the project.