The scheme include comprised the construction of 350m of 7.5m wide carriageway linking two industrial parks, including a security gate, a loop activated bollard (for buses only) and a full CCTV monitoring system.
Clifton Scannell Emerson Associates (CSEA) produced a Preliminary design, Part 8 Public Consultation documents and drawings, Detailed Design, Contract Documents and construction supervision.